Skip to content
For Civil engineers, contractors & quantity surveyors

Find the rate.Build the estimate.Prepare the bill.

Stop jumping between CPWD PDFs, old Excel files, and broken formulas. Mulyankan keeps rates, estimates, measurements, and billing connected in one civil project workspace.

CPWD DSR 2023 Project estimates RA & final bills
mulyankan.in/dsr-workbook Live data
Mulyankan DSR 2023 rate-analysis screen showing item 1.3 with labour, quantity, rate, and amount columns
01DSR rate02Estimate03RA / Final bill
Actual Mulyankan interface From the first lookup to the final record.

Built around the way civil works are actually prepared

CPWD DSR 2023RA & Final billsMeasurement BookExtra items & deviations
The 2026 release

Your rate-analysis tool now prepares the bill too.

Create a separate bill project for each work and move through the full post-execution workflow without rebuilding the same data in separate files.

A live abstract, not another linked spreadsheet

Agreement quantities, executed quantities, rates, previous payments, and since-previous amounts stay connected to the same bill project.

Tender percentage, GST modification, abatement, and extra items flow into the final SAY amount.
Open bill projects
AGCR Building · 3rd RA Bill
Saved
ABSTRACT OF COST3rd Running Account Bill
ItemDescriptionSince previous
5.1.1RCC in columns & beams₹2,00,175
8.2.1Teak wood door frames₹60,976
10.25Structural steel work₹1,92,325
Net payable this bill₹5,35,102
One connected workflow

Enter the measurement once. Let it travel.

Instead of maintaining fragile links between worksheets, Mulyankan derives every downstream quantity and amount from the work already recorded.

See the billing workspace
  1. 01

    Measure the work

    Capture location-wise dimensions, dates, additions, and deductions.

  2. 02

    Build the abstract

    Executed quantities, previous payments, and current amounts resolve automatically.

  3. 03

    Complete statements

    Prepare EI, AR, deviations, materials, recoveries, and checks from the same bill.

  4. 04

    Issue the package

    Export the selected statements to structured Excel or PDF files.

One platform, three jobs

Start with a rate. Finish with a record.

01

Rate intelligence

Find and recalculate DSR items

Search all 27 sub-heads, edit basic rates, and recalculate dependent items in the browser.

02

Pre-tender

Prepare a project estimate

Bring schedule and non-schedule items together with quantities, rate analysis, and a clear abstract.

03

Post-execution · New

Prepare RA and final bills

Carry measurements through the interlinked statements required to review and complete the bill.

Made for the project desk

For the people who prepare, check, and certify civil work.

PWD & CPWD engineersContractorsQuantity surveyorsConsultantsGovernment staffCivil engineering students
New billing workspace

The next bill can start without the old workbook.

Set up the work once, add your measurements, and let every connected statement follow.

Start a bill project